Main product image for Raspberry Pi stacking header with extra long leads
Product image 1 for Raspberry Pi stacking header with extra long leads
Raspberry Pi 2x20 stacking header with extra long leads (XL)
Components

These headers are great for stacking one or more HATs/pHATs on top of your Raspberry Pi.

Their extra long leads will give plenty of space between the shields you stack on top of each other.

  • The leads are 12mm long.
  • The receptacle part is 10mm high.

This product is compatible with the Raspberry Pi A+/B+/Pi 2/Pi 3/Pi 4 and Zero. Pin spacing is 2.54mm.

Links to code and documentation

No additional links provided for this product.

Shipping policy

We ship twice a week, typically on Tuesdays and Fridays.

This product does not ship to United States.

Raspberry Pi stacking header with extra long leads

Sold by omzlo

$1.76

No tax for United States [change]
This item is currently out of stock.
Sign up to get notified when this product is back in stock.

The seller

omzlo

omzlo logo

Thrakomakedones, Attica, Greece
102 orders since Dec 1, 2021
We are OMZLO, the creators of NoCAN, the "wired" IoT solution for makers based on CAN-bus. We love electronics and we build solutions for businesses and hobbyists alike...