# Raspberry Pi stacking header with extra long leads

Raspberry Pi 2x20 stacking header with extra long leads (XL)

- **Seller:** [omzlo](https://www.lectronz.com/stores/omzlo), Thrakomakedones, Attica, Greece
- **Price:** €1.60 (EUR, before shipping and taxes)
- **Availability:** Sold out
- **Categories:** Components
- **Product page:** https://www.lectronz.com/products/raspberry-pi-stacking-header-with-extra-long-leads

## Images

![Raspberry Pi stacking header with extra long leads](https://lectronz-images.b-cdn.net/lectronz/active_storage/representations/proxy/eyJfcmFpbHMiOnsiZGF0YSI6NjIwLCJwdXIiOiJibG9iX2lkIn19--03ffa640dd73ff367c03bd1666167c622e944890/eyJfcmFpbHMiOnsiZGF0YSI6eyJmb3JtYXQiOiJqcGciLCJyZXNpemVfdG9fbGltaXQiOls5NjAsNjQwXSwic2F2ZXIiOnsic3RyaXAiOnRydWV9fSwicHVyIjoidmFyaWF0aW9uIn19--970c165836a83091725a1a0fd4f37ce9408da1bf/2x20-GPIO-headersxlong.jpg)

## Description

These headers are great for stacking one or more HATs/pHATs on top of your Raspberry Pi.

Their extra long leads will give plenty of space between the shields you stack on top of each other.

* The leads are 12mm long.
* The receptacle part is 10mm high. 

This product is compatible with the Raspberry Pi A+/B+/Pi 2/Pi 3/Pi 4 and Zero. Pin spacing is 2.54mm.

## Shipping policy

We ship twice a week, typically on Tuesdays and Fridays. 
